Go back to the list

The Museum of London has embarked on an epic journey to create a new museum. Housed in impressive but dilapidated market buildings in Smithfield, the new museum will stand in the heart of West Smithfield, one of the city’s most historical and creative localities. They are now seeking a Master Systems Integrator for the new museum. The estimated contract value is £200,000.

Museum of London: Master Systems Integrator for New Museum Project

The Smart Building Contractor shall be responsible for the design development, coordination, supply, delivery, installation, testing, commissioning, demonstration and handover of the integration of the building sub-system networked devices required to achieve the required 'Smart' connected working environment as detailed within this specification.

The building's systems will be delivered as fully commissioned/functional systems, with their data storage and head end user interface where required. On completion, all relevant system static (asset) and dynamic (state) operating data will be available to communicate to a validation MQTT broker or future cloud services platform.

Procurement reference: BIP754434238

Contract start date: 28 July 2023

Contract end date: 22 June 2026

For further information, interested contractors should go to the following link.

The deadline for submission of proposals is 25 February 2023 by 12 pm.

Contact:

Museum of London
150 London Wall
London, EC2Y 5HN
UK
For the attention of: David Davies
+443335662663
david.davies2@srm.com

 

Image: Museum of London West Smithfield/Stanton